Key Tasks and Responsibilities:
– Produce design inputs (like Nozzle orientation and pipe loads, Support cleats/clips in 2D) to Mechanical, Civil and relevant departments.
– Preparation of Platform arrangement & detailed drawing.
– Involved piping design for pumps, Tanks, Chute and other mechanical equipment’s
– Preparing preliminary pipe routing for Initial MTO taken with respect to Equipment Layout and P&ID.
– Preparation of Foundation guidance drawings
– Preparation of Proposal for Engineering Task for Post Commissioning Work
– Preparation of Piping Schematic mark-up for Small bore Piping installation
– Preparation of Land aggregation Layout to assist solar power
– Planning Utility station and Eyewash/Safety shower location.
– Checking of Isometrics (P&ID Check, Line Routing, Support Check, Special requirement check etc.)
– Coordination with inter departments. · Coordinate sequence and plan the mechanical and piping work to avoid interferences with other disciplines while meeting project schedule
– Preparation of Overall Site Layout for recycled containerboard paper mill & Box Plant (showing Truck Movement, Trailer Parking, Car Parking, Roads, Pavements, landscaping details etc.) [2]
– Preparation of Piping Layout and Section detail Drawings (Greenfield & Brownfield), Piping Isometrics & support detail drawings for Pipes & Equipment’s.
– Reviews vendor documents and drawings.
– Preparation of demolition Mark-up on isometric drawing & Equipment Layout drawing.
– Preparation of OSBL Pipe Schematic Layout.
– Coordination between Team members & Team Leader.
– Get the Deliverables from team members and checked them with in the Promised time, de-livered them with quality to the client & Track progress of installation against the schedule.
– Preparation of Manhours Report (Detailed & Consolidated) by Monthly basis
– Conducting 3-D model review with client and other discipline(30%,60% & 90%)